Blockstream and Block Enlist Tesla, Break Ground on Bitcoin Mine

The mine, first announced in June 2021, will be powered by Tesla’s solar array and Megapack battery

article-image

The facility will be powered in part by Tesla’s 3.8 megawatt solar array | Source: Shutterstock

share

key takeaways

  • Tesla will provide solar and storage technology to the Texas-based mine
  • Blockstream will release a public dashboard with data on bitcoin mined and power output

Jack Dorsey’s digital payments company Block, formerly Square, and bitcoin infrastructure provider Blockstream have announced a development in the partnership they first announced in June 2021. After enlisting help from Tesla, they have broken ground on a solar- and battery-powered bitcoin mine. 

The West Texas-based bitcoin mine will use solar and storage technology from Tesla, Blockstream announced Friday. The facility will be powered by Tesla’s 3.8 megawatt solar PV array and 12 megawatt-hour Megapack.

West Texas, known for its high number of annual sunny days and sufficient wind speed, has become a hub for renewable energy in the US. 

The mine is expected to be completed later this year, according to Blockstream, which will provide the mining infrastructure for the facility. 

The combination of Tesla photovoltaics and Megapack battery equipment will drive the 30 petahashes per second of mining hardware at the facility with 100% solar energy, Blockstream wrote in a blog post Friday.

Additionally, Blockstream said it would provide regular reports on the economics of the project through a publicly-accessible dashboard. The dashboard will display real-time metrics of the facility’s performance, including power output and bitcoin mined. The team plans for the dashboard eventually to include solar, storage performance data points and uptime metrics, according to Blockstream. 

The project, first introduced at the Bitcoin 2021 conference in Miami in June, is a $12 million initiative. Block said in June that it would be investing $5 million toward the mining facility as part of its broader goal to reach carbon neutrality by 2030.“

The project will serve as an ongoing, transparent case study that will allow us to all learn together the specific unit economics of clean energy bitcoin mining,” Neil Jorgensen, global ESG lead at Block, said in the June 2021 release. “We can’t wait to start sharing our results with the community.”


Get the news in your inbox. Explore Blockworks newsletters:

Tags

Decoding crypto and the markets. Daily, with Byron Gilliam.

Upcoming Events

Old Billingsgate

Mon - Wed, October 13 - 15, 2025

Blockworks’ Digital Asset Summit (DAS) will feature conversations between the builders, allocators, and legislators who will shape the trajectory of the digital asset ecosystem in the US and abroad.

recent research

Research Report Templates (2).png

Research

We’re bullish on the PUMP token. We believe Pump.fun's brand strength, existing integrations, product roadmap, and strategic levers justify PUMP's TGE valuation, and expect the token to re-rate meaningfully higher in the months ahead.

article-image

Data shows frontrunning has declined on the network compared to last year

article-image

Industry watchers weigh in on what’s coming for bitcoin, M&A and tokenization before the year wraps

article-image

“We are open 24/7/365, but good luck getting an employee to pick up.”

article-image

BitVM3’s “garbled circuit” approach faces critical security and scaling research before it will be practical

article-image

Big blockers wasted a bitcoin fortune trying to prove a point

article-image

Coinbase’s newest acquisition includes the CEO and Head of Research from Opyn